Skip to main content

Accidents

Kuzma Minin grounding in Falmouth Bay

Kuzma Minin grounded in Falmouth Bay after dragging anchor off a lee shore in severe weather, with the crew's attempt to clear a fouled port anchor consuming the remaining sea room before the vessel could be turned away from the beach.

Classification

  • Incident Type: Grounded
  • Severity: High

Vessel Details

FieldValue
Vessel NameKuzma Minin
Vessel NamesKuzma Minin
Vessel TypeBulk Carrier
Flag StateRussia [RU]
IMO Number7721263
Gross Tonnage16257
LOA (m)180.50
Owner/OperatorJSC Murmansk Shipping Company, Russia
Year Built1980
Persons on board18

Incident Details

FieldValue
Date2018-12-18
Time05:25
LocationGyllyngvase beach, Falmouth, England
Coordinates50.1466, -5.0691
RegionUnited Kingdom
Fatalities0
Injuries0
Missing
Vessels sunk or lost
Investigation BodyMarine Accident Investigation Branch
Direct DamageBreached tanks, shell plate deformation, and partial bilge keel detachment
Economic Damage
Environmental impactNo pollution occurred.

Key facts

  • Kuzma Minin dragged its port anchor in southerly winds exceeding 50 knots while anchored about one nautical mile off a lee shore.
  • A discarded 28-metre chain fouled the port anchor and diverted attention from manoeuvring as the ship lost sea room.
  • The bulk carrier grounded on Gyllyngvase beach at 0525 UTC and was refloated at 1415 the same day using local harbour resources.
  • No one was injured and no pollution occurred, but the hull sustained breached tanks, shell deformation, and bilge keel damage.
  • The absence of P&I insurance and limited owner support complicated the appointment of salvors and access to suitable response assets.

Narrative

The Russia-registered bulk carrier Kuzma Minin entered Falmouth Bay after shortages of bunkers and main-engine lubricating oil disrupted its intended voyage. On 17 December 2018, no replacement lubricating oil was delivered. Although southerly winds up to Beaufort force 8 were forecast, the master remained at anchor about one nautical mile off Gyllyngvase beach. He ordered the engine to be kept at immediate readiness if the wind exceeded 31 to 33 knots and discussed the risk of dragging anchor with the bridge watchkeepers.

By 0400 UTC on 18 December, gusts exceeded 52 knots, the swell was four to five metres, and the vessel was yawing. At 0425 the electronic chart system's anchor-watch alarm sounded as the port anchor began to drag. The chief officer promptly called the master, alerted the engine room, and informed the crew. The master ordered the anchor weighed and advised Falmouth port that he intended to proceed to sea.

The bosun began heaving at 0438. Shortly before 0500 the anchor was aweigh, but Kuzma Minin fell beam-on to the wind and gathered leeway toward the shore. A discarded chain was caught across the anchor's flukes. Believing the obstruction to be substantial and concerned that continued manoeuvring might damage the anchor gear or propeller, the master stopped manoeuvring while the crew tried unsuccessfully to clear it. At 0510 the ship was six cables from the beach and moving north at more than two knots. Full-ahead power and port rudder did not turn the ship clear of Pennance Point. The anchor was let go again at 0519 but failed to hold, and the ship grounded at 0525.

Falmouth Harbour activated its emergency plan and assembled local tugs and a workboat. Lines were secured by 1122, and the ship de-ballasted while the response vessels worked in heavy swell. Assisted by its own engine, Kuzma Minin refloated at 1415 and anchored south of Pendennis Point. A later survey identified badly holed and deformed shell plating, three breached tanks, and a partly detached starboard bilge keel. There were no injuries or pollution. The vessel was detained, later sold to meet its owner's debts, and its crew were repatriated.

Sequence of events

Date/timeEvent
2018-12-18 04:00 UTCSoutherly winds were gusting above 52 knots, the swell was four to five metres, and Kuzma Minin was yawing at anchor.
2018-12-18 04:25 UTCThe port anchor began to drag; the chief officer alerted the master, engine room, and crew.
2018-12-18 04:38 UTCThe bosun began heaving the anchor while the master used the engine and rudder to check the vessel's movement.
2018-12-18 05:00 UTCThe anchor was aweigh and was found fouled by a discarded chain as the ship fell beam-on to the wind.
2018-12-18 05:19 UTCThe port anchor was let go again but did not hold.
2018-12-18 05:25 UTCKuzma Minin grounded on Gyllyngvase beach.
2018-12-18 14:15 UTCLocal tugs and a workboat, assisted by the ship's engine, refloated the bulk carrier.

Contributing factors

FactorEvidence statusDescription
Resource shortagesConfirmed findingLow bunkers and the absence of spare lubricating oil influenced the decision to remain at anchor on a lee shore despite the strong-wind forecast.
Severe weather and exposed conditionConfirmed findingWinds above 50 knots, the vessel's in-ballast condition, and a four-to-five-metre swell caused the anchor to drag.
Fouled port anchorConfirmed findingA discarded chain fouled the anchor and the unsuccessful effort to clear it consumed time and sea room while leeway exceeded two knots.
Limited insurance and owner supportConfirmed findingThe lack of P&I insurance created payment concerns that hindered the appointment of salvage experts and access to an additional high-powered vessel.

Investigation

The Marine Accident Investigation Branch published report 11/2019 in August 2019. It concluded that the vessel's resource shortages influenced the decision to remain at anchor, while severe weather, its in-ballast condition, and swell caused the anchor to drag. The report found that the bridge team detected the movement quickly and began putting to sea, but the fouled anchor interrupted that response. MAIB also found that Falmouth Harbour's same-day refloating operation was effective and recommended that the owner ensure its vessels had sufficient fuel and oils and maintained the required P&I insurance.

References

Similar incidents