Skip to main content

Accidents

Global Peace and Tom Tough (2006)

During a berthing operation at Gladstone’s Clinton Coal Terminal, Tom Tough was working aft of the Panamanian-registered bulk carrier Global Peace. At about 23:54, the tug’s starboard main engine shut down and its stern swung into the ship. The tug’s starboard quarter punctured Global Peace’s shell plating near the port deep fuel oil tank, releasing heavy fuel oil into the harbour.

Classification

  • Incident Type: Collision
  • Severity: High
  • Tug involvement: yes
  • Tug mechanism: Loss of propulsion

Vessel Details

FieldValue
Vessel NameGlobal Peace
Vessel TypeBulk carrier
Flag StatePanama [PA]
IMO Number8005082
Gross Tonnage67,727
LOA (m)263.00
Breadth (m)42.07
Year Built1982
Assisting tugTom Tough, Australian-registered z-peller tug (IMO 8112419)

Incident Details

FieldValue
Date2006-01-24
LocationClinton Coal Terminal, Port of Gladstone, Queensland, Australia
RegionAustralia
FatalitiesNot reported
InjuriesNot reported
MissingNot reported
Investigation BodyAustralian Transport Safety Bureau (ATSB)
Direct DamageGlobal Peace’s port deep fuel oil tank was punctured
Salvage/CleanupApproximately 25 m³ of heavy fuel oil escaped into Gladstone Harbour

Narrative

During a berthing operation at Gladstone’s Clinton Coal Terminal, Tom Tough was working aft of the Panamanian-registered bulk carrier Global Peace. At about 23:54, the tug’s starboard main engine shut down and its stern swung into the ship. The tug’s starboard quarter punctured Global Peace’s shell plating near the port deep fuel oil tank, releasing heavy fuel oil into the harbour.

Investigation

The Australian Transport Safety Bureau found that a cracked clutch-oil discharge pipe on Tom Tough’s starboard main engine emptied the system of oil and activated the engine shutdown. It estimated that about 25 cubic metres of heavy fuel oil entered Gladstone Harbour; the port’s response began immediately and clean-up continued for seven days. The report also identified shortcomings in fender protection, maintenance follow-up, engine-room monitoring and alarm alerting.

References