Classification
- Incident Type: Grounded
- Severity: High
Vessel Details
| Field | Value |
|---|---|
| Vessel Name | Maersk Kendal |
| Vessel Type | Container |
| Flag State | United Kingdom [GB] |
| IMO Number | 9332999 |
| Gross Tonnage | 74642 |
| LOA (m) | 299.54 |
| Breadth (m) | |
| TEU | 6200 |
| Year Built | 2007 |
| Crew Size | 25 |
| Owner/Manager | The Maersk Company Limited / A.P. Møller - Maersk A/S |
| Engine Power (kW) | 57200 |
Incident Details
| Field | Value |
|---|---|
| Date | 2009-09-16 |
| Location | Monggok Sebarok Reef, Singapore Strait |
| Coordinates | 1.1975, 103.80556 |
| Region | Other |
| Fatalities | |
| Injuries | 0 |
| Missing | |
| Cargo Loss | |
| Direct Damage | |
| Economic Damage | |
| Insured Loss | |
| Salvage/Cleanup Cost |
Key facts
- The UK-registered container ship was carrying about 3,100 containers from Laem Chabang to Tanjung Pelepas when it grounded.
- At 07:03 local time, Singapore VTIS instructed Maersk Kendal to slow because three ships were exiting Jong Channel; further warnings followed at 07:08, 07:10, and 07:13.
- The vessel grounded at about 07:15 on a heading of 246 degrees and a speed of about 14.2 knots.
- The grounding caused substantial damage to the fore peak, bow-thruster room, No. 1 void, and No. 1 centre ballast tank; about 120 tonnes of steel were later renewed.
- Salvors discharged 365 containers and about 3,000 tonnes of bunkers before the vessel was refloated on 23 September and returned to service on 12 November 2009.
Narrative
Maersk Kendal departed Laem Chabang, Thailand, with about 3,100 containers and was bound for Tanjung Pelepas, Malaysia. During the Singapore Strait transit, the master took the con while the chief officer supported him with position monitoring, communications, and collision avoidance. The vessel was still making about 21 knots when the bridge team entered the traffic separation scheme.
At 07:03 local time, Singapore Vessel Traffic Information System warned Maersk Kendal to slow for three ships exiting Jong Channel. The master altered course to starboard to pass astern of traffic and intended to return to the planned track. The MAIB found that the change from full-ahead manoeuvring to half-ahead did not reduce engine speed as the bridge team expected. The master and chief officer also misinterpreted which vessels VTIS had identified, did not use the ARPA trial-manoeuvre function, and did not reduce speed or alter course sufficiently after further warnings about shallow water.
After Samho Jewelry crossed the bow, the master ordered successive port helm movements. Maersk Kendal grounded on Monggok Sebarok Reef at about 07:15 at 14.2 knots. No injuries or pollution resulted. Two salvage tugs assisted, and the vessel was refloated after containers and bunkers were discharged. The hull and bow-thruster damage was repaired before the vessel resumed service.
Sequence of events
| Date/time | Event |
|---|---|
| 2009-09-14 | Maersk Kendal departed Laem Chabang with about 3,100 containers for Tanjung Pelepas. |
| 2009-09-16 05:15 UTC+8 | The vessel entered the eastern Singapore Strait traffic separation scheme. |
| 2009-09-16 07:03 UTC+8 | Singapore VTIS instructed the vessel to slow because three ships were exiting Jong Channel. |
| 2009-09-16 07:08 UTC+8 | VTIS again advised the vessel to reduce speed; the vessel was making about 19.1 knots over the ground. |
| 2009-09-16 07:10 UTC+8 | VTIS warned that Samho Jewelry was ahead and that Maersk Kendal appeared to be heading toward her. |
| 2009-09-16 07:13 UTC+8 | VTIS warned of shallow water ahead. |
| 2009-09-16 07:15 UTC+8 | Maersk Kendal grounded on Monggok Sebarok Reef at about 14.2 knots. |
| 2009-09-19 | Salvage operations began; 365 containers and about 3,000 tonnes of bunkers were discharged. |
| 2009-09-23 12:43 UTC+8 | The vessel was refloated. |
| 2009-11-12 | Maersk Kendal resumed service after repairs. |
Contributing factors
| Factor | Evidence status | Description |
|---|---|---|
| Excessive speed and ineffective speed reduction | Confirmed finding | The MAIB found that the bridge team remained confident that the vessel's speed would not affect safe navigation, while telegraph movements did not reduce engine speed as expected. |
| Misinterpretation of VTIS information | Confirmed finding | The master and chief officer misunderstood which vessels VTIS had referred to and did not clarify the information. |
| Poor bridge-team management and situational awareness | Confirmed finding | The investigation identified inadequate passage planning, poor position monitoring, ineffective interaction, complacency, and loss of awareness of the reef's proximity. |
| Inadequate ECDIS and ARPA use | Confirmed finding | The bridge team did not use the ARPA trial manoeuvre and monitored the vessel on an inappropriately configured ECDIS display that did not show the reef early enough. |
Investigation
The UK Marine Accident Investigation Branch investigated the grounding with the cooperation of Singapore's Maritime and Port Authority and issued report 2/2010 in March 2010. It identified the bridge team's speed management, traffic assessment, position monitoring, VTIS communications, and bridge resource management as contributing safety issues. No safety recommendations were issued because corrective actions had already been taken.
References
Related
- Singapore Strait
- Marine Accident Investigation Branch
- Maritime and Port Authority of Singapore
- Maersk
- American Bureau of Shipping
- Maersk Kendal
- Bridge Resource Management Failure
- Grounding
- Other