Tundra grounding at Sainte-Anne-de-Sorel

Tundra grounded off Sainte-Anne-de-Sorel after the pilot and bridge team failed to maintain a shared, continuously monitored passage plan.

Classification

  • Incident Type: Grounded
  • Severity: Low
  • Region: Canada

Vessel Details

FieldValue
Vessel NameTundra
Vessel TypeBulk Carrier
Flag StateRepublic of Cyprus [CY]
IMO Number9415208
Gross Tonnage19814
LOA (m)185.0
Crew Size18

Incident Details

FieldValue
Date2012-11-28
Locationoff Sainte-Anne-de-Sorel, Quebec, Canada
RegionCanada
Coordinates46.0200, -73.0100
Fatalities0
Injuries0
Missing

Key facts

  • Tundra departed Montreal under compulsory pilotage on 28 November 2012, bound for Halifax.
  • At about 21:48 EST, the vessel passed the intended intermediate turn and grounded off Sainte-Anne-de-Sorel after exiting the navigation channel.
  • Tundra was refloated on 5 December after cargo was lightened and sustained only minor damage.
  • TSB identified passage-plan discrepancies, weak bridge resource management, ineffective monitoring, and likely pilot fatigue as contributing factors.

Narrative

On 28 November 2012, the bulk carrier Tundra departed Montreal under compulsory pilotage for Halifax. During the downbound transit of the St. Lawrence River, the pilot relied mainly on buoys and did not use all available navigational resources. The pilot and bridge team did not maintain a shared, continuously monitored passage plan, and planned course changes were not effectively communicated to the bridge team. At about 21:48 EST, the vessel continued past the intended intermediate turn. As it moved out of the channel, bank effect increased and Tundra grounded off Sainte-Anne-de-Sorel, Quebec.

The vessel was refloated on 5 December after cargo was lightened. The report records no injuries or pollution and describes only minor damage, including scratches, a slight buckle in one propeller blade, and a missing rudder inspection cover. The Transportation Safety Board found that weak bridge resource management, passage-plan discrepancies, limited pilot-bridge communication, and ineffective monitoring contributed to the grounding. Pilot fatigue was considered a likely contributor to reduced situational awareness.

Sequence of events

Date/timeEvent
2012-11-28Tundra departed Montreal under compulsory pilotage, bound for Halifax.
2012-11-28 21:48 EST (approx.)The vessel passed the intended intermediate turn and grounded off Sainte-Anne-de-Sorel after exiting the navigation channel.
2012-12-05Tundra was refloated after cargo was lightened.

Contributing factors

FactorEvidence statusDescription
Passage-plan discrepanciesConfirmed findingThe pilot’s plan and the vessel’s plan were not reconciled into a shared, continuously monitored passage plan.
Pilot-bridge communicationConfirmed findingThe bridge team was not kept effectively informed of planned course changes and the pilot did not use all available navigational resources.
Bridge resource managementConfirmed findingMonitoring and information exchange were insufficient to detect and correct the developing deviation before the vessel left the channel.
Pilot fatigueSuspectedTSB considered fatigue a likely contributor to the pilot’s reduced situational awareness.

Investigation

The Transportation Safety Board of Canada’s final marine investigation report found that the grounding resulted from combined pilotage, bridge resource management, passage-planning, and monitoring failures. The report was released in May 2014 and also considered pilot fatigue as a likely contributing factor.